Arya Bhatta Journal of Mathematics and Informatics
  • Year: 2020
  • Volume: 12
  • Issue: 1

Minimizing total waiting time of j0bs in specially structured two stage flowshop with disjoint job block concept

  • Author:
  • Deepak Gupta1, Vandana2,, Manpreet Kaur2,
  • Total Page Count: 8
  • Page Number: 65 to 72

1Professor and Head, Department of Mathematics, MM University, Mullana, Ambala

2Post M. Sc. Scholar, Deptt. of Mathematics, Maharishi Markandeshwar (Deemed to be University), Mullana (Ambala)

*Email: vandanarana452@gmail.com

**kaurm5092@gmail.com

Online published on 28 May, 2020.

Abstract

The present paper is aimed to provide algorithm for minimizing the total waiting time of jobs for specially structured two stage flow-shop scheduling. The model includes the processing times associated with probabilities and transportation time with disjoint job block criteria. The algorithm is made clear by numerical illustration. The lemma has been provided on which study is based.

Keywords

Waiting time of jobs, Transportation time, Flow shop scheduling, Processing time, string of disjoint Job block etc