Arya Bhatta Journal of Mathematics and Informatics
  • Year: 2023
  • Volume: 15
  • Issue: 2

N×3 FSSM with Breakdown Interval to Minimize the Rental Cost

1Professor and Head, Department of Mathematics, M.M University, Mullana, Ambala, (Haryana)

2Research Scholar, Department of Mathematics, M.M University, Mullana, Ambala, (Haryana)

*E-mail : guptadeepak2003@yahoo.co.in

**itamannadhamija@gmail.com

Online Published on 12 December, 2023.

Abstract

The paper at hand deals with the minimization of the total rental cost for N×3 flow shop scheduling problem in which the effect of breakdown interval of machine is being considered. The algorithm defined in this paper is simple and easy to understand. An optimal sequence which minimizing the total rental cost regarding the problem has been discussed in this paper.

Keywords

Flow shop scheduling, Breakdown interval, Rental Policy, Utilization time