Arya Bhatta Journal of Mathematics and Informatics

  • Year: 2014
  • Volume: 6
  • Issue: 2

Availability analysis of two different units system with a standby having imperfect switch over device in banking industry

  • Author:
  • Surender Kumar1,, Pardeep Goel2,
  • Total Page Count: 6
  • DOI:
  • Page Number: 299 to 304

1Research Scholar, JJT University, Jhunjhunu (Rajasthan)

2Associate Prof., M. M. (PG) College, Fatehabad -125050 (Haryana)

Abstract

In this paper the availability analysis of a banking industry with two unit redundant system having imperfect switch using Regenerative point Graphical Technique (RPGT) is discussed. Initially two non identical units are operative and one unit if kept as standby. The standby put online with the help of an imperfect switch. The failure and repair rates are taken as exponential and system is discussed with the help of tables.

Keywords

Availability, Reliability, Primary Circuits, Secondary Circuits, Tertiary Circuits, Base-State, Regenerative Point Graphical Technique (RPGT), MTSF, Busy Period of the Server, Expected No. of Server's Visits, Cold Stand-by, Imperfect Switch