Arya Bhatta Journal of Mathematics and Informatics

  • Year: 2015
  • Volume: 7
  • Issue: 2

Tardiness of jobs and satisfaction level of demand maker in m-stage scheduling with fuzzy due time

  • Author:
  • Meenu Mittal1, T.P. Singh2, Deepak Gupta3
  • Total Page Count: 6
  • DOI:
  • Page Number: 353 to 358

1Research Scholar, M.M. University, Mullana, mansiynr@gmail.com

2Professor, Deptt. of Mathematics, Yamuna Institute of Engg. &Technology, Gadholi, Yamunanagar

3Professor & Head, Deptt. of Mathematics, M. M. University, Mullana, Ambala

Abstract

This paper investigates a general flow shop scheduling problem under fuzzy environment. The objective of the paper is twofold, i.e. to minimize the tardiness of the jobs on one side while to find the satisfaction level of demand maker on other side. The membership function of fuzzy due date assigns to each job indicates the satisfaction level of demand maker i.e. how much percent the customer is satisfied about the service within the time frame. The study has been made through heuristic application and the results are presented graphically which is helpful for the goodwill of the company when there is huge demand in the market.

Keywords

Fuzzy processing time, trapezoidal, tardiness, <AHR>