*Associate Professor, Ph.D, Fergana Polytechnic Institute, Ferghana, Uzbekistan
**PhD Student, Tashkent architecture-building institute, Tashkent, Uzbekistan
***PhD Student, Fergana Polytechnic Institute, Ferghana, Uzbekistan
Online Published on 03 January, 2022.
The article presents the work of the building in difficult soil conditions, building precipitation, measures to change the rigidity of the building, the main structural measures preventing uneven settlement of buildings and structures. The timing of construction can also affect the process of settlement of a building if its individual parts are erected at different times. The solution to the problem in such cases is to use lighter materials for the later fragments of the building. These can be brick or wood inserts between parts of the building made of reinforced concrete slabs.
Construction, Industrial, Subsidence, Significantly, Individual