An Application of New Heuristic Approach on Small Scale Industry for Flow Shop Environment

*Department of Mechanical Engineering, Tamilnadu College of Engineering, Coimbatore, Tamilnadu, India

**Department of Mechanical Engineering, Kalaignar Karunanidhi Institute of Technology, Coimbatore, Tamilnadu, India

***Department of Mechanical Engineering, SCAD College of Engineering and Technology, Tirunelveli, Tamilnadu, India

****P.G. Scholar, Industrial Engineering, Anna University, Regional Centre, Coimbatore, Tamilnadu, India

Online published on 2 July, 2016.

Abstract

In this paper, permutation flow-shop scheduling problem is solved with the objectives of minimizing total flow time. A new constructive heuristic is applied to solve the problem by using Rank Index heuristic for flow time. It is called as RIH-F approach. The proposed approach is applied on the taillard's bench mark flow-shop scheduling problem. Performance of the heuristic is measured by comparing the computational result with other heuristic approach result. All heuristic approach relative percent deviation are calculated with the best known value reported in the literature. From the computational result, the proposed approach is an alternative for the permutation flow-shop scheduling problem considering total flow time. Then the new heuristic approach is applied to demonstrate on small scale industry for flow shop environment.

Keywords

Permutation flow shop, scheduling, Rank index heuristic, Total flow time, Taillard's bench mark