International Journal of Engineering and Management Research (IJEMR)
  • Year: 2017
  • Volume: 7
  • Issue: 3

Machine Breakdown Inventory System with Multi Items and Partial Backlogging

  • Author:
  • Surbhi Singhal1, P. K. Gupta2, S.R. Singh3
  • Total Page Count: 7
  • Page Number: 758 to 764

1Department of Statistics, Vardhaman College, Bijnor, India

2Department of Statistics, D.A.V. College, Muzaffar nagar, India

3Department of Mathematics, C.C.S. University, Meerut, India

Online published on 31 October, 2017.

Abstract

This paper deals a production system with multi items and machine breakdown in which units are subject to deterioration at a time dependent rate. The unit production cost is taken to be a function of the finite production rate which is treated as a decision variable. A partially backlogged shortage has been discussed in this study. The solution procedure is illustrated with the help of numerical examples. The sensitivity of the variable to changes in the values of the parameters of the system is examined.

Keywords

Multi items, Volume flexible, partial backlogging and machine breakdown