International Journal of Engineering Research
  • Year: 2013
  • Volume: 2
  • Issue: 5

Standard Work Study in Physical Logistics Area: An Application of Automotive Equipment Manufacturer

  • Author:
  • Çağla Özkardeş, Seda Erkılıç, Cansu Şakar, Cansu Aras, Aslı Aksoy, Nursel Öztürk
  • Total Page Count: 6
  • Page Number: 322 to 327

Uludag University, Faculty of Engineering and Architecture, Industrial Engineering Department, Gorukle Campus, 16059, Bursa, Turkey

*Corresponding author asliaksoy@uludag.edu.tr

Online published on 8 November, 2017.

Abstract

Products are transported from depot to workstations and between workstations by milk-run vehicles in an automotive equipment manufacturer's plant. Milk-run operators were completing routes earlier than anticipated time for each path in current state, and, also, transported quantities were non-standard. Manufacturer aims to optimization and standardization of milk-run tours. This paper presents suggestions to get over existing problems of a manufacturer. Finally, workload acquisition was obtained with the results of the suggestions.

Keywords

Gantt chart, mathematical model, milk-run optimization, mixed integer linear programming