Abstract

This study note is a guideline to set-up a model mini hydro power station (2x500) KW capacity, using re-circulated water from a city lake. In terms of location, terrain, water availability and ease of interconnectivity Kaikondahalli & Agara Lakes in Bengaluru were found to be suitable for this Pilot Study.

Keywords

Power channels, Fore Bay, Penstocks and Power Block