Dept. Of Mechanical Engg., Vishwakarma Institute of Information Technology, Pune, Maharashtra, India
*Corresponding Email: gauravjpawar@yahoo.in
Online published on 8 November, 2017.
Single minute exchange of dies along with ECRS can be used efficiently to reduce setup time. The present paper provides an analysis of current changeover methods of bearing ring grinding machine in a manufacturing plant having line layout. The study gives methods for reducing setup time using above mentioned tools.
SMED, ECRS, Setup time, Line layout