Comparative Analysis of MIVAN Formwork Building and Conventional Formwork Building Based on Cost and Duration

  • Author:
  • Danish Sadruddin Ansari, Pratik Sudhakar Kudale
  • Total Page Count: 4
  • Page Number: 672 to 675

B.E, Department of Civil Engineering, Pad. Dr D.Y Patil Institute of Engineering, Management and Research-University of Pune, Akurdi-India

* danishdyp@gmail.com

** kudale10@gmail.com

Online published on 9 March, 2017.

Abstract

The project involves detailed cost estimation and duration analysis of a building constructed by MIVAN formwork and Conventional formwork. The buildings are of G+21 floors where the saleable area of building with Mivan formwork is 8747.28 S.ft and that with Conventional Method is 9786.67 Sft on each floor with 3.0 m as the height of each floor. Later comparative analysis is done on cost and duration of both the buildings.

Keywords

MIVAN formwork, Conventional formwork, Detailed estimation, Duration, Comparison