Management of Scheduled Delays and Their Impact on Operating Costs and Production in Open-Pit Mining Sites

  • Author:
  • Elias Tapia1,*, Angélica Vivanco2, Marcelo Paez1, Manuel Canovas1, Ariel Salar1, Andrés Soto-Bubert3, Roberto Acevedo3
  • Total Page Count: 14
  • Published Online: Oct 30, 2023
  • Page Number: 1 to 14

1Departamento de Metalurgia y Ingeniería de Minas, Universidad CatÓlica del Norte, Antofagasta, Chile

2Facultad de Ingeniería y Arquitectura, Universidad Arturo Prat, Avenida Arturo Prat 2110, entrada Sagasca, Chile

3Facultad de Ingeniería, Arquitectura y Diseño (FIAD), Universidad San Sebastián, Bellavista 7, Santiago, Chile

*Corresponding author E-mail: elias.tapia@ucn.cl

Online Published on 30 October, 2023.

Abstract

Effective management of scheduled delays is critical to increasing mining operation productivity. Here we analyse the effects of eight management strategies for shift change and collation/lunchtime on the production and total costs of a loading and hauling system. Strategies with two 12-hour shifts and shift change at the equipment site presented the best productivity and the lowest total costs. An incremental analysis of the number of ideal trucks to cover scheduled delays showed that when six trucks are kept in operation, annual production increases by 4.64% for the best strategy.

Keywords

Open-pit mining, Loading and hauling, Mining trucks, Mining shovels, Mining production, Shift change