Deptt. Of Mech. Engg, Raajdhani Engg. College, Bhubaneswar
Guided by: Krutibash Khuntia (Asst. Professor) and Mr. Kailash Mohapatra (Professor and Head, Deptt. Of Mech. Engg, Raajdhani Engg. College, Bhubaneswar)
Non-polluting renewable energy resources to limit the green house gases (GHG) impact on environment is receiving impetus worldwide and also from the government of India. The solar mission, which is part of the National Action Plan on Climate change has been set up to promote the development and use of solar energy for power generation and other uses. The ultimate objective of making solar energy more effective and usable every walk of life to the limited fossil-based energy options. The solar power generation system had been deployed in the various parts in the country for electrification where the grid connectivity is either not feasible or not cost effective as also some times in conjunction with diesel based generating stations in isolated places, communication transmitters at remote locations. With the downward trend in the cost of solar energy and appreciation for the need for development of solar power, solar power projects have recently been implemented. A significant part of the large potential of solar energy in the country could be developed by promoting grid interactive solar power systems of varying sizes as per the need and affordability coupled with ensuring adequate return on investment (ROI).Normally the payback period of any solar power generation unit is very high i.e. more than 10 years. It is important that the generation efficiency must be optimum for achieving the goal of a green globe through the renewable energy generations. So that it would be practically feasible and economical to install the renewable energy generation stations. This study is a step towards achieving the goal of optimum power generation efficiency of solar power plants and to enhance the use of the technology.