International Journal of Management IT and Engineering
  • Year: 2019
  • Volume: 9
  • Issue: 10

A study on selection of the approval method in construction project management ANN

  • Author:
  • Abdul Matin-Dostyar
  • Total Page Count: 8
  • Page Number: 100 to 107

Research scholar, Department of Civil, Noida International University

Online published on 25 August, 2021.

Abstract

A structure project is a strategy to meet the specific needs of clients, regardless of theory, expansion or improvement of adequacy. Just when you choose another structure plan, instead of renting, renting or acquiring an existing area, there is a regular prerequisite for a customized action plan that expects to achieve explicit goals. Recognizing objectives and classifying them can be difficult work, described as a variety of accomplices that can be integrated into the client's affiliation. Due to the purchase in the construction sector, the elements that affect the technique are similar to the company, the need for acquisition, climatic conditions powers such as political, social and social. , natural, etc. Think of everything before choosing the acquisition method. The work in the proposal refers to the determination of the acquisition technique in terms of the various impact variables and the prior information for which ANN is used for the selection procedure. ANN is the most appropriate intelligent framework to determine a procedure that actually eliminates past information. The ANN framework includes some states that are information, performance, and hidden states. The information and the states / layers of performance are unique in the system and the masked layer or state can be unique or different according to the prerequisites of the framework or field being considered.

Keywords

Purchases, Purchase techniques, Purchase systems, Artificial neural networks (ANN), Structure of the building, Construction project