INCOLD Journal (A Half Yearly Technical Journal of Indian Committee on Large Dams)
  • Year: 2021
  • Volume: 10
  • Issue: 1

Cascading Hydropower Projects on Teesta River Basin

  • Author:
  • S. R. Patnaik, V.P. Gadhe, B.S. Sundarlal, M.R. Bhajantri, V.V. Bhosekar
  • Total Page Count: 10
  • Page Number: 58 to 67

MoJS, DoWR, RD & GR, Central Water and Power Research Station, Pune, India

Online published on 11 November, 2021.

Abstract

in Teesta River Basin construction of a series of cascade dams for hydropower generation is the most significant development activity in the state of Sikkim and West Bengal. Hydraulic model studies play a vital role in finalizing the design of spillway and energy dissipator of the hydro-power projects. The paper describes the hydraulic model studies of the cascading hydropower projects on Teesta River Basin namely, Teesta-iV, TLDP-iV and TLDP-iii conducted at Central Water and Power Research station, Pune, india for evolving the optimum design of spillways, energy dissipators and layout of power intake structures.