INCOLD Journal (A Half Yearly Technical Journal of Indian Committee on Large Dams)

  • Year: 2019
  • Volume: 8
  • Issue: 1

Experience Gained During Full-Scale RCC Trial Embankment Construction at TLDP-IV

  • Author:
  • Chetan Hazaree1, Santosh Seevollynarayanan1, Veersen Sidhwani1, Ponnosamy Ramasamy2
  • Total Page Count: 10
  • Page Number: 40 to 49

1Hindustan Construction Company Ltd., Mumbai

2Design & RCC Consultant, Malaysia

Online published on 13 January, 2020.