Techno-commercial challenges and solutions obtained for gas insulated substation at Kamakhya

  • Author:
  • Santipriya Pal, Biswajit Bhattacharyya, Biswajit Mukherjee, Ayan Raychaudhury
  • Total Page Count: 3
  • Page Number: 4 to 6

Alstom T&D Ltd.

Online published on 12 January, 2015.

Abstract

The objective of this paper is to highlight different challenges encountered and solution obtained during execution of gas insulated substation at Kamakhya which is situated at stiff slope within small range. Due to the geologic adversity of the site different engineering philosophy was adopted than which are normally done for substations in plain terrain. Foundation activities were adopted without disturbing natural topography keeping in mind its inheritance. At the end high potential risk was avoided without additional commercial implication.

Keywords

Locational Challenges, Technical Challenges, commercial challenges, Techno-commercial solutions, Achievements