SKUAST Journal of Research
Open Access
  • Year: 2022
  • Volume: 24
  • Issue: 2

Improvement of water harvesting structures and changes noticed under integrated watershed management programme (IWMP): Jammu and Kashmir

  • Author:
  • Farhana1,*, Shijaatt Hussain Bhat1, A. H. Hakeem1, Sajad Abdullah Saraf2, Fehim Jeelani Wani2, Raihana Habib Kanth3
  • Total Page Count: 5
  • Page Number: 237 to 241

1Division of Agriculture Extension and Communication, Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir, Wadura

2Division of Agriculture Economics and Statistics, Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir, Wadura

3Division of Agronomy, Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir, Wadura

*e-mail: farhanasofi6@gmail.com

Online Published on 27 September, 2022.

Abstract

The present study was conducted in the three districts of North Kashmir namely Baramulla, Kupwara and Bandipora of Jammu and Kashmir, selected purposively on the basis of maximum projects under IWMP. From the selected 8 projects namely IWMP-I Rafiabad-A (n=34), IWMP-IX Rohama-B (n=53), IWMP-XI Pattan (n=79) and IWMP-XI Wagoora (n=61) from Baramulla, IWMP-IV Kalaroos (n=35), IWMP-V Kalaroos (n=34) and IWMP-IX Rajwar(n=17) from Kupwara and IWMP-II Malangam-I(n=37) from Bandipora with total number of 350(N), beneficiaries were selected randomly through proportionate sampling technique. The results depicted that majority of the beneficiaries (39.7%) and (41.9%) had found “satisfactory” improvement in quality of water harvesting structures through leakage plastering in the four and three selected watershed projects of district Baramulla and Kupwara respectively. Whereas, 48.6 per cent of beneficiaries had found “good” improvement in quality of water harvesting structures through leakage plastering from the selected one watershed project of district Bandipora. It was also recorded that majority of the beneficiaries (40.2%), (44.2%) had found “satisfactory” improvement in quality of water harvesting structures through decreasing the siltation in the four selected watershed projects of district Baramulla and Kupwara respectively. Meanwhile, 44.6 per cent beneficiaries had found “good” improvement in quality of water harvesting structures through decreasing the siltation from the selected one watershed project from district Bandipora.

Keywords

Beneficiaries, Management and sustainability, Watershed