TAI Journal
  • Year: 2021
  • Volume: 10
  • Issue: 1

Tunnel T-48: A challenge in India

  • Author:
  • A. Panciera
  • Total Page Count: 6
  • Page Number: 59 to 64

Lombardi Engineering Ltd., Locarno, Switzerland

Online published on 25 August, 2021.

Abstract

India is developing its railway network, linking the peripheral regions to the national network. In Kashmir, a new line extends from Jammu, to Srinagar and Baramulla (USBRL), in Kashmir, 270 km long: 50% is underground with 4 tunnels longer than 10 km. Indian Government assigned the general project management to IRCON, a-subsidiary of the national railway ministry. Long of 10'185 m, T-48 is the third longest railway tunnel in India, after T-80 and T-49 on the same line. It is single lane with lateral escape tunnel (excavation 53-74 resp. 2734 m2). Excavated D&B through carbonaceous and quarzitic phyllite, it has a maximum overburden of 1'150 m. At present 45% of the excavation is done. Major difficulties are the underground works execution and the-logistics. The initial contractor was terminated. A new contract was awarded after 6 months. Completion is now-foreseen end 2020 (3 years delay).