TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
  • Year: 2015
  • Volume: 4
  • Issue: 1

Risk Allocation Provisions in the EPC Contract Documents for the Vishnugad Pipalkoti Hydropower Project

  • Author:
  • Rajeev Kumar Vishnoi
  • Total Page Count: 8
  • Page Number: 35 to 42

General Manager, Civil Design Engg., THDC India Ltd., Rishikesh

Online published on 12 January, 2015.