Water and Energy Abstracts
  • Year: 2005
  • Volume: 15
  • Issue: 1

Concrete Lining of Square Junction Crossing of Tail Race Tunnel with Surge Gallery/Access to Bottom of Pressure Shafts in Nathpa Jhakri Hydro-Electric Project (6 x 250 = 1500 MW)

  • Author:
  • Kranti Kumar Gupta

(International Conference on Tunnelling Asia 2004 Need for Accelerated Underground Construction Issues and Challenges, 14-17 December 2004, New Delhi, India).

Keywords

Tunnellining, Concrete lining, Crown concreting, Cantilevers, Design criteria, Methodology