Concrete Lining of Square Junction Crossing of Tail Race Tunnel with Surge Gallery/Access to Bottom of Pressure Shafts in Nathpa Jhakri Hydro-Electric Project (6 x 250 = 1500 MW)
Author:
Kranti Kumar Gupta
(International Conference on Tunnelling Asia 2004 Need for Accelerated Underground Construction Issues and Challenges, 14-17 December 2004, New Delhi, India).