Analysis of the Results of the Rock Mass Stressed-Deformed State Monitoring During Underground Excavation of the Power House Chamber at Deriner HEPP Project, Turkey
Author:
V. Zhukov
(International Conference on Tunnelling Asia 2004 Need for Accelerated Underground Construction -Issues and Challenges, 14-17 December 2004, New Delhi, India).