Water and Energy Abstracts
  • Year: 2005
  • Volume: 15
  • Issue: 1

Analysis of the Results of the Rock Mass Stressed-Deformed State Monitoring During Underground Excavation of the Power House Chamber at Deriner HEPP Project, Turkey

  • Author:
  • V. Zhukov

(International Conference on Tunnelling Asia 2004 Need for Accelerated Underground Construction -Issues and Challenges, 14-17 December 2004, New Delhi, India).

Keywords

Underground construction, Underground excavations, Chamber, Monitoring