Water and Energy Abstracts
  • Year: 2005
  • Volume: 15
  • Issue: 1

Constructing Tunnels in Walled City, Delhi by TBM

  • Author:
  • M. Singh, Kamal Nayan, V.K. Singh

(Infemational Conference on Tunnelling Asia 2004. Need for Accelerated Underground Construction -Issues and Challenges, 14-17 December 2004, New Delhi, India).

Keywords

Underground corridor, Twin-bored tunnel, Traffic movement, Tunnel Boring Machines, Methodologies