(216.73.216.189)
(Tunnels & Tunnelling International, December 2004, pp. 23).
Geological conditions, Drill and blast tunnelling, Massive hard rock, Low stability, Realistic estimates, Tunnelling methods, Scheduling, TBM performance, Performance prediction models