Water and Energy Abstracts
  • Year: 2005
  • Volume: 15
  • Issue: 4

Modification of TG Emergency Oil Pump Starting Scheme at NALCO, CPP, Angul

  • Author:
  • R.K. Padmapati

(BHEL “Feedback” Journal, Vol. 30, No. 1, March 2005, pp. 20-24).

Keywords

Installed capacity, Unplanned load, Disturbances