(216.73.216.189)
(Proceedings of the Institution of Civil Engineers, Water Management, Vol. 158, Issue WM3, September 2005, pp. 93-102).
Tarbela dam project, Construction, Upper Swat scheme, Parabolic canal, Unconventional facets