Tunnelling in Water-Bearing Unconsolidated Ground According to Specifications for Auxiliary Methods Revised to Reflect Varying Soli Conditions -Construction in the North Work Section of the Takaoka Tunnel on the HokurikuShlnkansen Railway Line
Author:
F. Furukawa, Y. Hino, H. Inoue, K. Assri, J. Yorita
(Underground Space - the 4th Dimension of Metropolises -Bartak, Hrdlna, Romancov & Ziamal, London, pp. 1527).
Keywords
Short bench cut method, Tunnel face, tunnel crown, High cost effectiveness