(Electrical India, October 2007, pp. 99–101)
The demand for energy in India is growing at a faster rate to meet industrial growth. Due to several constraints, it was not possible to meet the target set in the 9th and 10th Five Year Plans. During the above planned period, merely 50% of the target could be achieved. At this juncture it is imperative to focus on energy conservation measures. The capital cost required to get the benefits is less compared to the cost required for equivalent generating capacity addition. In most of the energy conservation projects, the payback period is less than one year – which is every attractive, and the benefits are recurring. The present paper will discuss about various energy conservation opportunities available in large commercial complexes.
Faster rate, Demand for energy, Juncture, Energy conservation, Generating capacity, Opportunities