(Tunnelling and Underground Space Technology, Vol. 23, No. 5, September 2008, pp. 481-491)
Artificial neural networks have been used to analyze a number of engineering problems, including settlement caused by different tunneling methods in various types of ground mass. This paper focuses on settlement over shotcrete-supported tunnels on Silo Paulo subway line 2 (West Extension) that were excavated in Tertiary sediments using the sequential excavation method. The adjusted network is a good tool for predicting settlement above new tunnels to be excavated in similar conditions. The influence of network training parameters on the quality of results is also discussed.
Underground excavation, Neural network, Settlements, Subway, Tunnels, Instrumentation, Sequential excavation