Water and Energy Abstracts

  • Year: 2008
  • Volume: 18
  • Issue: 3

Operating Experience of 13.2 kV Superconductlng Cable System at AEP Bixby Station

  • Author:
  • D. Lindsay, M. Roden, D. Willen, A. Kerl, B. Mehraban
  • Total Page Count: 2
  • DOI:
  • Page Number: 54 to 55