Water and Energy International
SCOPUS
  • Year: 2015
  • Volume: 58r
  • Issue: 7

Operational Experience of Madeira River Project in the Brazilian Interconnected Power System under Initial Configuration

  • Author:
  • A.P. Guarini, A.R.M. Tenório, P.E.M. Quintão
  • Total Page Count: 1
  • Page Number: 75 to 75

ONS, Brazil

CIGRE, Paris Session 2014

Keywords

HVDC Power Transmission, Back-to-Back, CCC Converters, AC Harmonic Filters, Metallic Return Operation