Water and Energy International
SCOPUS
  • Year: 2016
  • Volume: 59r
  • Issue: 3

The Application of Horizontal raise Boring Technology for the Construction of Sixteen Cross Passages of the naples Subway's “Linea 1” Extension

  • Author:
  • Rigazio Andrea, Cocchi Roberto, Caputo Emilio
  • Total Page Count: 2
  • Page Number: 74 to 75

Gallerie e grandi opere sotterranee – 37/116, December 2015 – pages 31–39