Takalkar Power Engineers & Consultants Pvt. Ltd., India
Online published on 9 August, 2016.
The Dholera Special Investment Region (DSIR) will be a major smart city cum new industrial hub located on a Greenfield site of Gujarat state in India. The site is strategically situated between the main industrial centres of Ahmedabad, Vadodara, Surat, Rajkot and Bhavnagar. The aims of it is the creation of an economically and socially balanced, new age City with world class infrastructure and high quality of life. Adoption of a sustainable approach across key components such as transportation, industries, overall urban development and resource efficiency form the basis of this Plan. Phase-I of DSIR will be developed first in five years from now. Town planning schemes, TP1 and TP2 are part of Phase-I. Town planning scheme 2 is divided in to two part, TP2E and TP2W. Power demand and power network of TP2E, are focussed in the paper. Methods which are adopted to calculate maximum power demand, transmit the bulk of power to distribution substation, distribute total power demand at consumer end, operation for the entire power network for TP2E one of the Activation zone of Dholera SIR, etc. all covered in the paper here under.
Smart city, Town Planning, Max. Power Demand, Transmission Lines, Distribution Lines, Gas Insulated Substation, Power Cable, Auxiliary Supply, System Study, SCADA and Smart Grid System