Water and Energy International
SCOPUS
  • Year: 2017
  • Volume: 60r
  • Issue: 2

Adoption of Premolded Joint and Specialized Cable Installing Method for the 275 kV XLPE Cable Underground Transmission line in a Tunnel

  • Author:
  • S. Kobayashi, H. Suyama, T. Ohimo, S. Yokoyama
  • Total Page Count: 1
  • Page Number: 76 to 76

*Chubu Electric Power Co.

**Sumitomo Electric Industries, Ltd.

***Viscas Corp., Japan

CIGRE Paris Session 2016

Keywords

Premolded Joints, Cable Installation, AC Withstand Voltage Test, Measurement - Partial Discharge, Joint - Quality Control