*D.Y. Patil College of Engineering, Pune
**L&T Construction-Power Transmission & Distribution
Online published on 18 September, 2018.
In any of the industry flashovers in electrical system is quite often and generally handled casually. But when any of the vulnerable auxiliary or MCC become out of service on account of loose connection, it is difficult to handle the situation as the emergency systems of the process industry gets locked which simultaneously may be associated with huge revenue loss. All attempt should be made to minimize such electrical flashovers by adopting suitable technical measures.