Water and Energy International
SCOPUS
  • Year: 2018
  • Volume: 61r
  • Issue: 7

Experience Gained During Full-scale RCC Trial Embankment Construction at TLDP-IV

  • Author:
  • Chetan Hazaree, Santosh Seevollynarayanan, Veersen Sidhwani, Ponnosamy Ramasamy
  • Total Page Count: 9
  • Page Number: 46 to 54

*Hindustan Construction Company Ltd., Mumbai, India

**Design & RCC Consultant, Malaysia

Online published on 22 April, 2019.