Water and Energy International
SCOPUS
  • Year: 2018
  • Volume: 61r
  • Issue: 8

A Study of the Failure and Repair Rate Indicators of the Itaipu Generator Units

  • Author:
  • R.J.G.C. Silva, R.B.R. Tufaile, P.H. Galassi
  • Total Page Count: 1
  • Page Number: 76 to 76

Itaipu Binacional, Brazil

CIGRE Paris Session 2018

Keywords

Probabilistic Model, Bathtub Curve, Failure Rate, Mean Time To Repair, Maintenance Politics, Calculation Window