Case study in Jordan for operation of frequency relays in load shedding schemes and comparison between the frequency rate of change settings and the threshold settings
Author:
Eng. Mohammad Daoud Mohammad
Total Page Count: 1
Page Number: 79 to 79
National Electric Power Company (Nepco), Jordan
Online published on 12 April, 2021.
Keywords
Load shedding, Under frequency, Setting, Rate of change, Threshold, Relays, Protection schemes