Water and Energy International
SCOPUS
  • Year: 2007
  • Volume: 64
  • Issue: 1

Evacuation of power from Tehri HPP stage – I

  • Author:
  • H.M. Kothari, P.K. Srivastava, Nitin Kumar
  • Total Page Count: 2
  • Page Number: 406 to 407

Tehri Hydro Development Corporation Ltd.

Abstract

The salient features of the Power Evacuation arrangement from 4x250 MW Tehri HPP Stage-I have been described in the paper. The beneficiary States/Union territory gets power through Meerut Sub- Station from 220 kV lines of Power Grid Corporation of India Limited (PGCIL) net work.