Case Study in Jordan for Operation of Frequency Relays in Load Shedding Schemes and Comparison Between the Frequency Rate of Change Settings and The Threshold Settings
Author:
Eng. Mohammad Daoud Mohammad
Total Page Count: 1
Page Number: 76 to 76
National Electric Power Company (Nepco), Jordan
CIGRE Paris Session 2018
Keywords
Load shedding, Under frequency, Setting, Rate of change, Threshold, Relays, Protection schemes