Water and Energy International
SCOPUS
  • Year: 2024
  • Volume: 67r
  • Issue: 1

Study on the effective inspection & replacement strategy for 145KV GIS

  • Author:
  • T.H. Kim1, J.J. Kim1, H.A. Jang2, W.Y Yun2
  • Total Page Count: 1
  • Page Number: 76 to 76

1HYOSUNG Corporation, Republic of Korea

2Pusan National University, Republic of Korea

Online Published on 6 May, 2024.

Keywords

GIS (Gas Insulated Switchgear), Maintenance, RCM (Reliability Centered Maintenance), FMECA (Failure Mode Effects and Criticality Analysis), LTA (Logic Tree Analysis), Simulation