Geological Challenges Faced in Construction of Concrete Dam and their Solution - A Case Study from Punatsangchhu-II (1020MW), Hydro Electric Project, Bhutan

  • Author:
  • Arun Kumar1, Rajesh Chandel2, Ajay Kumar3, Thinley Dorji4
  • Total Page Count: 1
  • Page Number: 79 to 79

1Sr. Resident Geologist (GSI)

2Managing Director, Punatsangchhu-II Hydroelectric Project, Bhutan

3Director (Technical), Punatsangchhu-II Hydroelectric Project, Bhutan

4Joint Managing Director, Punatsangchhu-II Hydroelectric Project, Bhutan

ICOLD Intl. Symposium on Dams for People, Water, Environment & Development, 29th Sept. - 3rd Oct., 2024, New Delhi

Keywords

Excavation, Shear Zone, Reinforcement, Grouting