Water and Energy International
SCOPUS
  • Year: 2024
  • Volume: 67r
  • Issue: 2

Design of Multi-Vendor Bay Solutions and their Interoperability Performance Assessments in a Fully Digital Substation

  • Author:
  • L Chen1, H Li1, T Charton2, R Zhang2, B Peng3, P Newman4, D Geach5, C Popescu-Cirstucescu6, C Dormer7
  • Total Page Count: 1
  • Page Number: 77 to 77

1The University of Manchester, UK

2National Grid, UK

3NR Electric UK Ltd., UK

4GE Energy Connections, UK

5Siemens plc, UK

6ABB UK Ltd., UK

7Capula Ltd., UK

CIGRE Paris Session 2018

Keywords

Architecture, IEC 61850, Interoperability, Multi-Vendor Bays, SCL Configuration, Visualisation