Water and Energy International
SCOPUS
  • Year: 2024
  • Volume: 67r
  • Issue: 5

Major engineering challenges encountered during construction stage a case study - north- south corridor of Pune metro rail project, Pune, Maharashtra

  • Author:
  • Sandeep Potnis1, Anand Singh2, Lalit Kumar Verma2
  • Total Page Count: 2
  • Page Number: 75 to 76

1MIT World Peace University, Pune

2Gulermak-Tata Projects Ltd.

International Conference on Climate Resilience and Sustainability in Tunnelling & Underground Space, 22-23 November 2023, Mumbai

Keywords

Building condition survey, NATM, Mutha river, Piling TBM tunneling