Feasibility Aspects of a Synchronous Coupling of the IPS/UPS with the UCTE

  • Author:
  • M. Luther1, I. Biemacko2, D. Preotescu3, J.M. Rodriguez-Garcia4, A. Menze5
  • Total Page Count: 1
  • Page Number: 62 to 62

1Trrmspower GmbH, Germany

2Entso-E, Belgium

3C.N. Transelectrica S.A., Romania

4Red Elctrica de Espoiia S.A., Spain

5E.On Kernkraft GmbH, Germany

ClGRE, Paris Session 2010

Keywords

Feasibility study, European transmission system development, system coupling, synchronous interconnection, system stability