Additional Superintending Engineer, Maintenance Bhakra Left Bank Power House, BBMB (PW), Bhakra
Online published on 8 January, 2014.
‘Renovation and modernization (R&M) of hydro power plants is a cost effective way of dealing with the problem of low production levels. It is comparatively easier than constructing new projects and can yield results in about three to four years’
The following paper provides tips on selecting various R&M activities along with residual life assessment