Indian Journals

(216.73.216.69)

  • About Us
  • Contact Us
Host with us
 
  • Find a Journal
  • Author Services
  • Publisher Services
0

IndianJournals.com is a vast collection of Indian scholarly and research publications

Products

  • Journals
  • Collections
  • For Authors
  • For Publishers
  • Price List

Company

  • About
  • Terms & Conditions
  • Privacy Policy
  • Copyright
  • FAQs

Account

  • Login/Register

Support

  • Contact us

Copyright © 2026 Indian Journals., its licensors, and contributors. All rights are reserved, including those for text and data mining, AI training, and similar technologies.

  1. Home
  2. Journals
  3. Water and Energy International

Water and Energy International

SCOPUS

Water and Energy International

  • Year: 2014
  • Volume: 57b
  • Issue: 3
  • About the Journal
  • Current Issue
  • Past Issues
  • Author Guidelines
  • Sample Issue
  • Year: 2014
  • Volume: 57b
  • Issue: 3

Table of Contents

  • RESEARCH NOTE

    Importance of Phase Shifting Transformers in Power System
    • Author: M. Vijayakumaran
  • Development of India’s First Phase Shifting Transformer
    • Author: S. Sachdeva, R.K. Singh, S.K. Gupta, J.S. Kuntia, R.K. Tiwari
  • Phase Shifting Transformers – Bhel's Experience
    • Author: A. Yuva Raju, S.V.N. Jithin Sundar
  • Wide Area Measurement System - Information System for Power System
    • Author: A.K. Mishra, N.S. Sodha
  • Post Synchronization Experience in Indian Grid
    • Author: Chandan Kumar
  • PROCEEDINGS PAPER

    Workshop on Innovative Measures for Grid Stability, Including Phase Shifting Transformers & WAMs: 29–30 may 2014, CBIP Conference Hall, New Delhi
    • RESEARCH ARTICLE

      New Technologies for Rapid Dam Construction
      • Author: Nilotpol Kar, Sven Asmus, Jan Kluegge, Todd Mcgurgan
    • Identification of Hydrological Parameters of Mithi river, Mumbai, India using SRTM-DEM Dataset
      • Author: Khan Mujiburrehman
    • Seepage Uplift Pressures Beneath Structures on Permeable Foundations
      • Author: M.R. Goyal
    • RESEARCH NOTE

      DAM India: 2014 Rehabilitation of Dams and Appurtenant Structures: 27–28 may 2014 at New Delhi
      • Growth of Installed Capacity
        • Ratle Hydro Electric Project
          • NEWS AND VIEWS

            R.s.T. Sai Becomes CMD Of NHPC
            • India likely to see over 5% power shortage this fiscal
              • Delhi Power Crisis Resolved as bses get Rs 1,000-Cr loan from PFC/REC
                • Piyush goyal plugs into Gujarat model for power
                  • India Achieves 12.95% of renewable energy potential
                    • Algae biofuel may solve energy crisis
                      • India in world's top five nations in solar power capacity
                        • Fate of dabhol power project hungs in balance
                          • Adani Power Wants Modi Govt NOD for export of power to Pakistan
                            • Modi plans new policy to clean Ganga
                              • Delhi Metro 1.25 Km Tunnel
                                • Aerial Survey for tunnel project kicks off
                                  • Europe's longest tunnelled road
                                    • Dagachhu Hydropower project to run by mid-july
                                      • DASU Dam project calls for four tunnels
                                        • Interlinking of rivers to get new push under modi government
                                          • MP CM seeks to declare Narmada-Malwa link as national project
                                            • Pipelines for SAUNI to be laid from next month
                                              • Head race tunnel of Kishanganga project completed in record time
                                                • ABSTRACTS OF DISSERTATIONS OR ARTICLES

                                                  Experiences with Wireless Transformer Monitoring System Installed by the Manufacturer and Operated at Strategically Important locations of the Mexican Grid
                                                  • Reliability Modelling of Aged Circuit-breakers using data from the design Process
                                                    • A new Concept for Test Equipment for Testing Large HV and UHV Cables On-site
                                                      • Structural Analysis for Transmission Latticed Steel Tower in the 400 kV Transmission Lines El Tablazo – Cuatricenteneario No. 1 and 2
                                                        • Experimental Investigations to the Joint Resistance Bolted Substation and Transmission Line Connectors and its Conformity to Test Standards
                                                          • Static Var Compensator Enhancing the Operational Reliability of Finnish Transmission network
                                                            • The Impact of Renewable Energy Sources and distributed Generation on Substation Protection and Automation
                                                              • A Mathematical structure for the Assessment of Transmission System Augmentation in the Australian national Electricity Market
                                                                • Detection of Rotor Winding Shorted Turns in Turbine Generators and Hydrogenerators
                                                                  • DSM in Spain. GAd Project. Aims, developments and Initial Results
                                                                    • Direct Solution for Water Surface Profile in Circular Channels
                                                                      • Characteristics of Vortex Structure in Multi-Horizontal Submerged Jets Stilling Basin
                                                                        • Velocity Field in a Reservoir in the Presence of an Air-core Vortex
                                                                          • Sand dams: A Sustainable Solution for Water Scarce Regions
                                                                            • Tube-a-manchette Grouting at Upper Rivington Reservoir
                                                                              • Worth Farm Flood detention Reservoir: Challenges during Construction
                                                                                • Llyn Alaw Reservoir Post-tensioned Anchor Installation
                                                                                  • Scour Valve Replacement at digley Reservoir
                                                                                    • Norsborg – Stockholm Metro Underground depot
                                                                                      • Truck Fire in Lochkov Tunnel
                                                                                        • TBM Advance Geological Forecasting on the neelum-Jhelum Project
                                                                                          • EDITORIAL

                                                                                            From Editor's desk